PROJECT: 

Gatwick Airport, Crawley

Intelligent Voltage Optimisation improves Gatwick’s sustainability

Over the past 60 years, Gatwick has grown from just 186,000 passengers to over 40 million passengers. The busiest single runway airport in Europe, Gatwick has two runways whcih can’t be used at the same time due to their proximity. Passengers are managed through two terminals: North and South, both of which have 31 stands each, with an additional 57 remote stands served by coaches. The ability to use a stand flexibly means Gatwick can park up to 186 planes.

At a glance

  • Power & Distribution Infrastructure
  • Electrical Services

OUR APPROACH AND IMPACT

Powercor was commissioned to work with iVolt to install two No. 800Amp iVolt® Intelligent Voltage Optimisation Units at the South Terminal’s arrivals and departures to improve overall sustainability and also achieve energy-cost savings in excess of 10%.

The units Powercor fitted to the site at Gatwick Airport Ltd (GAL) are now enjoying a reduction on Carbon output of 147.9 metric tonnes – a significant reduction in both energy consumption and costs.

The project was undertaken as part of an LV upgrade and consisted of 2x 800A/528 kVA units installed on C1 & C2 section of the South Terminal. C1 & C2 has an annual consumption of 3,597,000 kWh. The savings on C1 are averaging 11% and the savings on C2 are averaging 9.6%. In total over 10% reduction in kWh consumption is being seen which represents savings of over £35,000 per annum.

Powercor worked alongside Environ, Graden Services and iVolt to ensure there was minimal disruption and that the stringent Health and Safety policies and statements were adhered to. The installation was faultless from start to finish.

Powercor’s team of eight engineers prepared, installed, connected, tested and inspected the complete installation. The job was over seen by the Construction Terminal Projects Team at GAL to ensure compliance to their terms of business.

Reduced costs

A 10% reduction in energy costs at South terminal

Fully Approved

A seamless and faultless install, fully approved by the on-site Gatwick team

Expedited delivery

Minimal disruption to airport staff and passengers

Regulatory compliance

All health and safety guidelines adhered to with a full-set of documentation provided

The two iVolt 800A/528 kVa units have been in for over a year now and have run faultlessly.

Construction Terminal Projects Team at GAL

Recent projects

About

Contact us

Services

LED lighting and controls

Solar and battery storage

Emergency lighting and compliance

Metering and measurement

Power infrastructure

Maintenance

Sectors

Education

Office and industry

Manufacturing and warehouses

Sports

Healthcare

Retail and hospitality

High-end residential

Public sector