Powercor have started the renewing of the Emergency Phone system at the Rotherhithe Tunnel. The work involves the installation of 3500 metres of Galvanized trunking and Conduit System. Powercor are also installing a fibre cable directly through the tunnel and are wiring the complete phone system. The work is being carried out on Friday nights and is expected to take 20 weeks.

